Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | TORICH |
Model Number : | DIN2391-1 |
Certification : | ISO,CE |
Price : | Negotiated |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability : | 25000 tons/year |
Delivery Time : | 25-35 Days |
TORICH,located in Ningbo, has more than 20 years hisory in EN10305-1,DIN2391 precision steel tube industry with much experience in export
1.Details of precision seamless steel tube:
OD:4-76mm
Wall thickness:0.5-8mm
Material:E215 E235 E355 ST35,ST37.4,ST45,ST52.4 etc
2.Equivalent standard:
Precision steel tube | |||||
Standard | Material | Delivery | Surface | Sizes | |
DIN | 2391/1630/2445 | ST37.4 ST52.4 | NBK | 1) BA 2) 2)Black phosphating 3) Galvanizing | OD 2 -60mm × WT0.3 -10mm |
EN | 10305-4 | E235 E355 | (+)N | ||
BS | 3602 | CFS 360 | Zinc Layer thickness more than 8um | ||
Other steel grades also available upon request |
3.Delivery condition:
The tubes can be produced in the following delivery conditions:
BK (+C) Cold finished/hard (cold finished as drawn).
No heat treatment after the last cold forming process.
BKW (+LC) Cold finished/soft (lightly cold worked)
After the last heat treatment there is a light finishing pass (cold drawing).
BKS (+SR) Cold finished/stress relieve annealed.
After the final cold forming process the tubes are stress relieve annealed.
GBK (+A) Annealed.
After the final cold forming process the tubes are annealed in a controlled atmosphere.
NBK (+N) Normalized. (Mainly focus on)
After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere
4.Main feature of DIN2391 precision seamless steel tube:
High precision
Excellent brightness
No oxidization on outer and inner walls after heat treatment
High cleanness of inside wall
High pressure
No deformation after clod bending
No crack after flaring and flattening
Color : Gray with white
5.Product show after production:
QUALITY CONTROL:
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring
Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield
Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
6. FAQ
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and
solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is
30-60 days if the goods are not in stock, and it is according to
quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to
pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us
![]() |